Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 21787 REL 13: 200302300 CAP NWS CHIEF JOSEPH WATER SUPPLY ENGINEERING REVIEW
Project Number:
Title:
Chief Joseph Hatchery Program
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
21787 REL 13
Contract Title:
200302300 CAP NWS CHIEF JOSEPH WATER SUPPLY ENGINEERING REVIEW
Contract Continuation:
Previous: Next:
21787 REL 9: 200302300 CAP (NWS) CHIEF JOSEPH WATER SUPPLY ENGINEERING REVIEW
  • 21787 REL 16: 2003-023-00 CAP COE-NWS CHIEF JOSEPH HATCHERY WATER SUPPLY ENGR
Contract Status:
Closed
Contract Description:
Contractor: US Army Corps of Engineers
Project Number: 2003-023-00
Project Name: Chief Joseph Hatchery Program Step 2, 3 Planning
Contract Period: January 1, 2007 through December 31, 2007
Prepared by:  DJ Warren & Associates Inc. for the Colville Tribes and BPA
Date: 12_14_06

GENERAL COMMENT:
This contract is for the US Army Corps of Engineer's (COE) staff to provide specific data and information and review of engineering documents related to the water supply for CJHP to Tetra Tech KCM, the design engineer contracted by Bonneville Power Administration and the Colville Confederated Tribes'. COE staff will also be providing information related to land leases to support BPA and CCT.  COE is also being requested to participate on an advisory steering and design committee.

PURPOSE:  
The purpose of this Statement of Work is to continue the implementation of the 3-Step Planning Process of the Northwest Power & Conservation Council (NPCC) for a Chinook salmon hatchery to supplement populations in the Okanogan and Columbia Rivers per Hatchery and Genetic Management Plans developed by the Colville Confederated Tribes and fishery co-managers.

PROJECT GOAL:
The goal of this project is to develop products and planning documents to be approved through the NPCC Step process.  The specific goal for this contract will be to supply information that will help support completion of requirements of NPCC Step 2 and Step 3. The goal of this contract is provide information to support NEPA, needed regulatory requirements and produce detailed designs of artificial propagation facilities necessary to implement comprehensive plans for management of Chinook salmon in the Okanogan River and the Columbia River above Wells Dam.

BACKGROUND:  
"For specific background information on this project please refer
to the Step 1 Chief Joseph Dam Hatchery Program Master plan submitted to BPA and the NPCC in May of 2004."

LOCATION OF PROJECT:  
The project is located in the Okanogan Sub-basin in the U.S. and Canada, and the mainstem Columbia River upstream from Wells Dam, all in the Columbia Cascade Province.  Project work will be conducted by the Colville Confederated Tribes, fishery co-managers, and consultants in the Province and in private and public offices throughout the region.
Account Type(s):
Capital
Contract Start Date:
01/01/2007
Contract End Date:
12/31/2007
Current Contract Value:
$10,018
Expenditures:
$10,018

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Colette Adolph Colville Confederated Tribes Yes Administrative Contact colette.adolph@colvilletribes.com (509) 422-5652
Mickey Carter Bonneville Power Administration No Env. Compliance Lead macarter@bpa.gov (503) 230-5885
Nikki Dick Colville Confederated Tribes No Administrative Contact nikki.dick@colvilletribes.com (509) 631-2200
Linda Hermeston Bonneville Power Administration Yes COR llhermeston@bpa.gov (503) 230-4764
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Joe Peone Colville Confederated Tribes No Interested Party joe.peone@colvilletribes.com (509) 634-2113
Dan Warren D J Warren and Associates, Inc. Yes Technical Contact dan.warren@djwassociates.com (541) 929-4639
Diana White Colville Confederated Tribes No Administrative Contact diana.white@colvilletribes.com (509) 643-2109


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Attendance in Steering Committee. Involvement in Water Supply agreement. A: 169. Provide Reviews during STEP 2 Process 03/30/2007 03/30/2007
Involvement in Water Supply Agreements. B: 170. Provide Reviews during STEP 3 Process 12/31/2007 12/31/2007
Information provided for Required Reports C: 119. Provide Reporting, Budget Development and Plans for Step 2 & Step 3 Activities 12/31/2007 12/31/2007
Draft Agreements for COE Land Leases D: 92. Finalize Lease Agreements for Hatchery Site 12/31/2007
Provide information for and review of preliminary and final designs E: 175. Conduct Activities to Produce Preliminary Design & Specifications 12/28/2007 12/28/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 169 Council 3-step Process: Step 2
  • 1 instance of WE 170 Council 3-step Process: Step 3

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 169 Provide Reviews during STEP 2 Process 02/09/2007
B 170 Provide Reviews during STEP 3 Process 02/09/2007
C 119 Provide Reporting, Budget Development and Plans for Step 2 & Step 3 Activities 02/09/2007
D 92 Finalize Lease Agreements for Hatchery Site 02/09/2007
E 175 Conduct Activities to Produce Preliminary Design & Specifications 02/09/2007
F 185 Periodic Status Reports for BPA 02/09/2007